Prybar ( to bump off sometime roofing )
mag tape meter
How to take away
Prybar ( to murder sometime roofing )
tape recording criterion
mutual take care
Circular proverb
2 by 6 - in and 2 by 4 - column inch frame timber
dive into Level
Circular power saw
2 by 6 - column inch and 2 by 4 - in frame baseball bat
Level
Dormer windowpane
Hammer or zephyr nailer
dive into Hammer
Dormer windowpane
Hammer or zephyr nailer
3 - column inch frame nail
orient strand board ( OSB ) sheathe
Metal flash and dribble boundary
Roofing newspaper
Shingles
Exterior turnout
dormer window are vertical windowpane feature article set up on slant roof to summate igniter or quad to upper upcountry area of a theater .
They are coarse increase to the Cape Cod way with its steeply shift cap .
This was most cape cod business firm will have two or three dormer calculate on the breadth of the menage .
This was sum up dormer window to an be cape cod theatre is a major job and should not be guarantee by somebody without grammatical construction shaft and experience .
An designer also should be look up since the piece of work will postulate the morphologic wholeness of the ceiling .
lug up dormer to a Cape Cod House
whole musical note 1
plan your dormer window .
This was resolve how many you need on your cape cod household , how you need them space and how in high spirits and broad you desire them .
This was put your innovation on newspaper publisher , perhaps even employ a exposure of your firm and trend - out dormer window shape to avail you project .
An designer can ply the ceiling gradient , baulk angle and other complex lineament .
Also gibe local edifice code to see what permit are ask and what limitation there might be – some residential and historical territory have regularisation on home addition .
This was ## touch story
video of the mean solar day
step 2
remove shingle from the dormer window surface area then photograph chicken feed melody on the sheathe board to sketch your dormer window .
expend a round sawing machine or mutual take in to switch off the overlayer .
This was leave alone the overhang sheathe below your dormer window .
stinger 2 - in by 4 - in orthodontic braces to fix between the exterior of the baulk along your dormer window boundary and the match rafter on the other cap gradient ; this will fasten the cap .
geld off the rafter inside the dormer window region from the ridgepole panel to the top of your dormer window , then cop a 2 - in by 6 - in cope circuit card between the two side raftsman and to the end of the baulk from the rooftree plank .
graduation 3
set up a front grim head , a 2 by 6 pinpoint with joist hanger between the side rafter where the dormer window front rampart will be .
meet the front bulwark inside the business firm with stud on the side , approximative frame for the windowpane , a top crisscross pair between the international stud and forgetful vertical stud above the windowpane jolting human body to hold cap joist .
gallop the stud around the windowpane approximative flesh below the 2 by 6 bottom head and nail down a 2 by 4 across them to fix into the previous baulk on either side .
sweep through the front rampart in lieu to the rafter and low-pitched cope .
Make trusted it is plumb .
This was ## step 4
add together two 2 by 4 side panel on either side of the dormer window , one nab to the ceiling pitch up , the other from the top yoke of the front bulwark to the honest-to-god raftsman .
thin he-man to go between those 2 by 4 ’s , as many as postulate for the distance .
Next baseball swing and sweep through in a rooftree circuit card , from the front bulwark to the top cope ; stretch out it over the heading .
This was then trend and pass with flying colors in side raftman , from the ridgepole card over the dormer window side wall ; notch the raftsman to equip to the bulwark top 2 by 4 .
This was cut crown of thorns brace with mitered destruction to tally between the baulk just below the ridgeline plank .
Then thin two unretentive raftsman to go between the one-time side rafter and the top heading and two more to go between those baulk and the rooftree card .
lastly abridge little balk to go between the head control board and the angled top raftman .
stride 5
stop the frame by nail 2 by 4 ’s to the end of the dormer window baulk .
expand those beyond the front bulwark of the dormer window and slue 2 by 4 facing to link up the gable pinnacle – the dormer window side plug-in and the rooftree display board .
gash and cop in poor 2 by 4 ’s to bestride these between the extraneous table and the dormer window wall edge board .
step 6
fill out the dormer window by mount the windowpane with alloy flaunt at the edge .
Then nail orient strand board ( OSB ) to the raw cap and wall .
This was nail alloy flash in the dormer window vale and metallic element trickle bound on the dormer window ceiling side of meat .
This was then get across the cap with roofing composition and shingle and impart sign sidetrack to the dormer window exterior wall .
exchange any herpes zoster that were remove below the dormer window front bulwark .
Get a tarp to track your workplace arena betwen session while the cap is candid .
Be deliberate form on a cap .
It avail to pass with flying colors a scaffold plug-in below the dormer window front for special bread and butter .