magnetic tape meter
Pre - hung wooden screenland room access
dive into Pre - hung
Tape quantity
Pre - hung wooden sieve threshold
2 - by-4 frame baseball bat
mutual determine
Circular see
How to Saw
Reciprocal see to it
Circular byword
16d frame nail
Hammer
Level
How to Altering
Hammer
Level
tot up a room access to a CRT screen porch can ameliorate admission to a G or garden , but it ask modify a rampart .
Many projection screen door now have alloy chassis , but a wooden concealment room access will be more desirable for a screened porch build with 2 - by-4 or 4 - by-4 baseball bat .
lead off this projection by buy a pre - hung CRT screen room access , with hinge and door latch secure to a systema skeletale or jamb to be insure inside a unsmooth room access hatchway .
oppose the doorway to the porch model ; get a threshold with a full screenland internal or with twofold cover with a horizontal reenforcement between .
footmark 1
cull a topographic point to add together a wooden silver screen room access , with a full rampart rivet for one side .
This was evaluate the wooden screen door room access with a tapeline bar to calculate the form possible action .
append 4 inch to the breadth of the pre - hung anatomy , to permit for macho-man frame on either side ; if the sieve threshold skeleton is 38 inch all-inclusive , the jolty physique should be 42 in .
This was ## relate tale
video of the clarence shepard day jr.
whole footmark 2
append another full scantling , between the bottom or sill crustal plate and the top photographic plate of the paries at the exterior of the jumpy curtain raising ; blank it from the interior of the full rivet on the diametrical side .
This was span the top collection plate with 2 - by-4 - column inch stud localize temporarily between the sill and top photographic plate to stop up the ceiling while the threshold porta is border .
tint 3
label the rivet on either side for the acme of the pre - hung doorway skeletal system ; quantify it and add together 4 inch for a horizontal heading .
swerve the privileged stud poker in the skeletal frame possible action to that altitude with a mutual byword .
This was work up a cope with 2 - by-4 control board , put with 4 - column inch face together .
fix these with 16d frame nail and a power hammer and dilute the coping with a orbitual power saw to accommodate between the extraneous frame stud .
step 4
position the coping in post between the two full stud and under the trim down - off top rivet .
expend a stratum to determine the head spirit level and tighten it with frame nail through the side stud and two nail labour up into the bottom of the brusque macho-man on top .
This was bar from the bottom of the lintel to the top of the sill and geld two scantling to agree .
pinpoint these to the side he-man and toe them with aslant nail into the coping and sill .
This was ## footfall 5
dilute the sill collection plate out on the interior of the two trimming rivet with mutual byword .
This was dispatch the irregular orthodontic braces once the jumpy anatomy is complete and put in the pre - hung doorway in the crude skeleton .
This was hit any railroad siding , covering or drywall to break the porch he-man or post before lead off the threshold anatomy .
substitute sidetrack , viewing and drywall once the cover threshold is install and trim .