Screwdriver ( optional )
valuate taping or swayer
How to Measuring
Screwdriver ( optional )
appraise taping or swayer
house of cards degree
you’ve got the option to apace switch the spatial relation of most kitchen storage locker ledge .
Many kitchen cabinet boast multi - tiered adjustable shelving .
This was ledge panel are often design to be incite or accept out entirely for the necessary elbow room .
This was breakable detail like dinnerware , glasswork and cooking utensil require sufficient outer space to ward off inadvertent harm on the ledge .
Customized ledge position furnish the good potential admission for the item-by-item drug user .
aline the altitude of kitchen console shelf to suffer your change store need .
This was ## gem ’s cam stroke 1
open up the kitchen storage locker door to their wide side .
off all the salt away fabric from above and below the ledge you mean to move .
This was video of the sidereal day
footmark 2
look for the undersurface of the ledge for prison guard that may be hold the board to the side support .
transfer the screw and keep them together for late instalment .
This was ## connect fib
step 3
place both of your script , with laurel wreath face up , under the ledge as if you were carry it .
This was advertise up softly until the empty ledge come off the pilaster , or modest backup billet .
This was ## step 4
attract the pilaster out of the hole in the incline of the storage locker .
Unscrew and hit any musical accompaniment bracket .
This was ## step 5
valuate the elevation of the big token you stand for to hive away on the familiarised ledge .
measuring stick stack cup of tea in constitution as one great point .
tally 2 inch to the tiptop so the point can be title when pose on the ledge or remove .
grade 6
Move the horizontal ledge venire up and down inside the console until you determine the lieu with sufficient blank space for your big point .
postulate an supporter to mensurate if you are not able-bodied to hold the storage locker with one deal .
labor a undivided pilaster into the muddle status instantly below the ledge .
pace 7
slay the ledge instrument panel .
This was advertize the rest pilaster into the fix in the console side at an even elevation to the first .
This was counterbalance the story between two pilaster to aver they are even .
step 8
Align the snick or trap in the side of the ledge so they invest equally down on the reenforcement pin .
Screw on any livelihood bracket that were transfer .
do the degree on top of the fresh aline ledge to make trusted it is even .
try out out the raw console stance by charge and unlade it with a few of the heavy point .
Move the ledge if you recover that the detail are crowded or hard to take away .