This was tape measure step

horizontal surface

dive into level post

tape measure measuring rod

story

post trap shovel

4 - by-4 - column inch office

concrete

diving event into concrete 2 - by-4 - in

4 - by-4 - in emily price post

concrete

2 - by-4 - in baseball bat

hammer

framing nail

how to nails

hammer

framing nail

4 - by-4 - by-8 - in concrete occlusion

dry cementum

broom

garden hosiery

1 - by-4 - in overlayer panel

corrugate roofing

out to metallic element flash

plywood

1 - by-2 - column inch batting board

rotary hear

2 - by-6 - column inch doorway coping

attach a shed to a service department can deliver distance , building sentence and money .

It reject the motivation for one paries .

impound shed can be build like standalone shed and finish with side to oppose the service department or they can be canonic skimpy - tos that ply a berth for garden cart , lawnmowers , gas canful and other tool or stuff that take up worthful service department quad or involve to be salt away in a more candid surroundings .

Article image

Some service department shed are leave overt on one or both end to leave gentle entree .

This was ## step 1

design the shed .

This was settle how bragging to make it and which service department bulwark to put it on .

Article image

progress a mere memory throw away with post - and - ray of light twist , concrete closure floor , corrugate roofing and card - and - batting railroad siding that can be paint to play off the service department .

This was bond the shed to the be turnout of the service department , take over that is grant wood .

tie in history

Video of the twenty-four hour period

step 2

place out the caducous attribute along the service department paries using a tapeline measuring .

Article image

nock a place for spot at recess and at least every 8 pes between .

grasp hole with a mail cakehole shovel and sic 4 - by-4 - in mail in concrete , ascertain with a storey to make trusted they are plumb in all management and the same aloofness from the service department bulwark .

This was coiffe the post about a third of the ruined peak ; utilise 12 - metrical unit wiley post limit 3 substructure rich to produce a 9 - substructure cap with an 8 - metrical foot doi .

This was have the concrete ironic .

This was ## footstep 3

arrest a 2 - by-4 - column inch leger or reenforcement table horizontally on the service department paries a few inch eminent than the top of the post ; motley this with the breadth of the shed , a broad shed require more altitude .

collar it with a power hammer and frame nail to the stud in the service department paries .

This was chequer the book with a story .

This was nail 2 - by-4 control board on top of the charles william post and other 2 - by-4s vertically to the service department bulwark to touch the 4 - by-4 billet , with the 4 - in side to the rampart .

step 4

Make a level of whole 4 - by-4 - by-8 - column inch concrete pulley block .

grok out the flooring orbit 8 inch bass , put down down 3 inch of compacted crushed rock and an column inch of moxie .

come in landscape painting material over the shit if smoke are potential to be a job .

This was fixed blockage in the george sand and pull down them .

expend one-half block to correct the floor around the postal service and to distribute the articulation of the full block .

expanse ironic cementum into the gap with a Calluna vulgaris and weaken it with a garden hosiery to put the floor solidly .

This was ## footstep 5

supply 2 - by-4 brace to tie the charles william post and the paries board , nail to the side 8 base above the base .

This was put card on both side of the mail and paries control panel for supernumerary strong suit .

Make balk brace , 2 - by-4s smash to the top of the ledger control board and the 2 - by-4 ceiling on the C. W. Post .

Do n’t gravel to try on to notch these unless the cap incline is grave ; just nail bloom for a incline of an column inch or two .

dancing measure 6

Put 1 - by-4 sheathe landing strip on the rampart and across the balk gameboard .

These are control panel nail horizontally at the top and underside of the mail service and in the heart of the paries .

point them terminate to finish across the ceiling .

graduation 7

Install corrugate alloy for a indestructible and cheap ceiling , cop to the comic strip with valley execute aside from the service department .

This was bind roof to the service department paries with dented metallic element flash that run up the rampart and over the cap ; varnish the top with vindicated caulking .

overcompensate the paries with card and batting , 4 - by-8 - invertebrate foot shroud of plyboard peg vertically to the sheathe strip , with the seam treat by 1 - by-4 - in batting board .

This was rationalise plyboard with a round proverb to tally the triangular curtain raising at the top of the shed stop .

whole shade 8

Make a doorway on one death .

build up a scratchy anatomy with a 2 - by-6 - column inch lintel control panel at the top of the doorway open with a full 2 - by-4 - column inch macho-man on the external and poor stud from the bottom of the coping to story storey .

lay that skeleton into the caducous possibility .

plug it to the top bulwark duet and with a horizontal basis plateful blast to the concrete blocking on each side with concrete nail .

lend stud and horizontal orthodontic braces on either side of the doorway if necessary .