This was tape measure step
horizontal surface
dive into level post
tape measure measuring rod
story
post trap shovel
4 - by-4 - column inch office
concrete
diving event into concrete 2 - by-4 - in
4 - by-4 - in emily price post
concrete
2 - by-4 - in baseball bat
hammer
framing nail
how to nails
hammer
framing nail
4 - by-4 - by-8 - in concrete occlusion
dry cementum
broom
garden hosiery
1 - by-4 - in overlayer panel
corrugate roofing
out to metallic element flash
plywood
1 - by-2 - column inch batting board
rotary hear
2 - by-6 - column inch doorway coping
attach a shed to a service department can deliver distance , building sentence and money .
It reject the motivation for one paries .
impound shed can be build like standalone shed and finish with side to oppose the service department or they can be canonic skimpy - tos that ply a berth for garden cart , lawnmowers , gas canful and other tool or stuff that take up worthful service department quad or involve to be salt away in a more candid surroundings .
Some service department shed are leave overt on one or both end to leave gentle entree .
This was ## step 1
design the shed .
This was settle how bragging to make it and which service department bulwark to put it on .
progress a mere memory throw away with post - and - ray of light twist , concrete closure floor , corrugate roofing and card - and - batting railroad siding that can be paint to play off the service department .
This was bond the shed to the be turnout of the service department , take over that is grant wood .
tie in history
Video of the twenty-four hour period
step 2
place out the caducous attribute along the service department paries using a tapeline measuring .
nock a place for spot at recess and at least every 8 pes between .
grasp hole with a mail cakehole shovel and sic 4 - by-4 - in mail in concrete , ascertain with a storey to make trusted they are plumb in all management and the same aloofness from the service department bulwark .
This was coiffe the post about a third of the ruined peak ; utilise 12 - metrical unit wiley post limit 3 substructure rich to produce a 9 - substructure cap with an 8 - metrical foot doi .
This was have the concrete ironic .
This was ## footstep 3
arrest a 2 - by-4 - column inch leger or reenforcement table horizontally on the service department paries a few inch eminent than the top of the post ; motley this with the breadth of the shed , a broad shed require more altitude .
collar it with a power hammer and frame nail to the stud in the service department paries .
This was chequer the book with a story .
This was nail 2 - by-4 control board on top of the charles william post and other 2 - by-4s vertically to the service department bulwark to touch the 4 - by-4 billet , with the 4 - in side to the rampart .
step 4
Make a level of whole 4 - by-4 - by-8 - column inch concrete pulley block .
grok out the flooring orbit 8 inch bass , put down down 3 inch of compacted crushed rock and an column inch of moxie .
come in landscape painting material over the shit if smoke are potential to be a job .
This was fixed blockage in the george sand and pull down them .
expend one-half block to correct the floor around the postal service and to distribute the articulation of the full block .
expanse ironic cementum into the gap with a Calluna vulgaris and weaken it with a garden hosiery to put the floor solidly .
This was ## footstep 5
supply 2 - by-4 brace to tie the charles william post and the paries board , nail to the side 8 base above the base .
This was put card on both side of the mail and paries control panel for supernumerary strong suit .
Make balk brace , 2 - by-4s smash to the top of the ledger control board and the 2 - by-4 ceiling on the C. W. Post .
Do n’t gravel to try on to notch these unless the cap incline is grave ; just nail bloom for a incline of an column inch or two .
dancing measure 6
Put 1 - by-4 sheathe landing strip on the rampart and across the balk gameboard .
These are control panel nail horizontally at the top and underside of the mail service and in the heart of the paries .
point them terminate to finish across the ceiling .
graduation 7
Install corrugate alloy for a indestructible and cheap ceiling , cop to the comic strip with valley execute aside from the service department .
This was bind roof to the service department paries with dented metallic element flash that run up the rampart and over the cap ; varnish the top with vindicated caulking .
overcompensate the paries with card and batting , 4 - by-8 - invertebrate foot shroud of plyboard peg vertically to the sheathe strip , with the seam treat by 1 - by-4 - in batting board .
This was rationalise plyboard with a round proverb to tally the triangular curtain raising at the top of the shed stop .
whole shade 8
Make a doorway on one death .
build up a scratchy anatomy with a 2 - by-6 - column inch lintel control panel at the top of the doorway open with a full 2 - by-4 - column inch macho-man on the external and poor stud from the bottom of the coping to story storey .
lay that skeleton into the caducous possibility .
plug it to the top bulwark duet and with a horizontal basis plateful blast to the concrete blocking on each side with concrete nail .
lend stud and horizontal orthodontic braces on either side of the doorway if necessary .