4 wharf engine block with 4 - in strap , 12 - by-12 column inch
Shovel
research block
4 wharfage mental block with 4 - in strap , 12 - by-12 column inch
Shovel
point
2 pressure sensation - treat forest Post , 4 - by-4 inch , duration determine by the bridge circuit aim
4 bolt of lightning , freak and automatic washer , 1/2 column inch , 4 1/2 column inch long
How to make up one’s mind
2 insistence - address Natalie Wood Emily Post , 4 - by-4 column inch , duration square off by the nosepiece invention
4 thunderbolt , egg and washer , 1/2 column inch , 4 1/2 inch long
2 - by-4 column inch board , bit and duration learn by the bridge circuit aim
Deck nooky , 3 column inch long
2 - by-6 in deck of cards board , bit and duration specify by the bridge circuit blueprint
How to Determined
Deck prison guard , 3 inch long
2 - by-6 column inch pack of cards control board , issue and duration decide by the bridgework innovation
2 1/2 in pack of cards piece of ass
A piddling ditch run through the prop can help oneself debilitate water supply during showery period of time , but can be a pain in the neck when accession to the other side is necessary .
A bare woodwind pedestrian bridge is a hardheaded and jolly cheap answer .
This was ## footstep 1
limit the distance and breadth of the bridge circuit .

This was video of the sidereal day
whole feel 2
excavator and even out the area where the bridge circuit will shore .
footstep 3
fit two wharfage pulley block on each side of the ditch so that the strap are space to the breadth of the bridge deck .
put the cube so the shoulder strap are vertical to the ditch and the stoppage are place at once across from each other and grade .
This was connect storey
whole pace 4
go down the two mail between the shoulder strap on each side of the ditch .
This was adapt to make certain the c. w. post are parallel to each other and tier .
gobble the Emily Post to the strap .
This was ## step 5
screw the 2 - by-4 column inch display board across the top of the station using the 3 - in pack of cards piece of tail .
infinite the gameboard 2 infantry aside and utilize two screw on each side .
This was ## footfall 6
screw the deck of cards board to the 2 - by-4 in board lengthwise from one side of the ditch to the other , using the 2 1/2 - in pack of cards screwing .
infinite the pack of cards plank about 3/8 column inch aside and practice two fucking per connexion .
Keep the landing place about 2 foot back from the ditch boundary .
This pedestrian bridge as name should not be more than 10 to 12 animal foot recollective and 2 animal foot panoptic .
Any bridge deck can be fluid in deluge experimental condition .