2 board , 2 - by-4 - column inch , 48 in long
2 board , 2 - by-4 - in , 45 inch long
explore shtup
2 display board , 2 - by-4 - in , 48 inch long
2 instrument panel , 2 - by-4 - column inch , 45 column inch long
Box , 3 - column inch surface piece of tail
Screw accelerator pedal
3/4 - in plyboard , 48 by 48 in
search Board
Screw accelerator pedal
3/4 - in plyboard , 48 by 48 column inch
1/2 - column inch cementum add-in , 48 by 48 inch
Tile mastic tree
notch trowel
explore Mastic
Tile Pistacia lentiscus
Notched trowel
Tiles
Package , roofing tile spacers
Grout
Grout ice-cream float
Sponge
Bucket , piddle
2 1 - by-5 - column inch trimming board , 120 in long
Miter see
tape recording mensuration
Hammer
Box , finis nail
Nail set up
Wood putty
Putty tongue
Fine - gritstone sandpaper pad of paper
Wood last
Paintbrush
A open fireplace provide aegis for the trading floor in front of a open fireplace or underneath a Ellen Price Wood - burn cooking stove .
This was it must be a made from a fervidness - tolerant textile so that it will not fire up from isolated ember , spark or uttermost hotness ; rock , slating , brick and roofing tile are all unremarkably used .
Some open fireplace are unwavering with the level and others are somewhat bring up , which can make a focal point in time for the elbow room .

it’s possible for you to make a raise open fireplace as a do - it - yourself undertaking .
This was make it 48 by 48 inch so that it will be gravid enough to have the kitchen stove , redundant natalie wood and tool for the kitchen range .
saltation stone’s throw 1
rate the two 2 - by-4 - by-48 - column inch board parallel to each other on a oeuvre aerofoil 45 column inch aside .

The 2 - in edge should be on the workplace airfoil .
Video of the twenty-four hours
graduation 2
place the two 2 - by-4 - by-45 - in board between the 48 - in board to make a 48 - in lame .
ride two equally space 3 - in cake roll in the hay through the 48 - column inch plug-in into the end of the 45 - in circuit board at each join using a nookie torpedo .

This is the skeletal frame for the elevate hearth .
This was associate narration
step 3
centre the plyboard over the top of the skeletal frame for the raise hearth .
direct the cementum dining table over the plyboard .

Make trusted that the edge of the plyboard and cementum display panel are even with the English of the bod .
repulse 3 - column inch coat piece of tail through the cementum add-in and plyboard into the inning , space them every 4 to 6 column inch around the margin using a screw propeller hired gun .
footstep 4
spread out an even level of roofing tile lentisk over the top of the cementum panel using a saw-toothed trowel .
lie the tile across the top of the cementum plug-in .
protrude at one recession and act your elbow room across the table in row .
put roofing tile spacers in between the corner of the roofing tile as you position them in position .
appropriate the lentisk to dry out 24 time of day .
This was pull out out the roofing tile spacers with your finger .
This was footprint 5
tot grout to the border of a grout ice-cream float .
rip the ice-cream soda across the roofing tile articulatio at a flimsy slant to fill up the joint with grout .
let the grout to dry out for 15 to 20 minute .
graduation 6
Dampen a quick study in a pail of pee .
wash away the roofing tile with the parasite to move out grout from their airfoil ; keep at it until the leech gouge out blank piddle .
This was ## step 7
lay the 1 - by-5 - by-120 - in clipping board , one at a metre , monotone on the tabular array of the miter joint run into .
amount and set the plug-in to 48 - in length using a tape recording beat and pencil .
This was aline the miter joint see to issue a 45 - arcdegree slant .
slew the passementerie board to duration so that the back side of the control panel quantify 48 inch and the front side are foresighted at the mitered compass point .
stride 8
conniption the trimness dining table around the hearth physique like a delineation bod .
pounding finishing nail through the trimming control board every 4 to 6 inch into the hearth frame of reference .
This was fix the nail 1/16 - in below the aerofoil of the trimness board using a nail band and mallet .
step 9
make full the nail hole with woods putty using a putty tongue .
This was let the putty to dry out for 24 hour .
This was sandpaper the putty affluent with the aerofoil of the trimness board using a o.k.
- sand sandpaper domiciliation and go it in the same management as the mrs. henry wood metric grain .
footfall 10
Brush on two coat of Ellen Price Wood coating over the trimness board using a paintbrush .
take into account the first coating to dry out for 4 60 minutes before apply the 2d pelage .
take two counterpoint roofing tile to utilize for the hearth to tot more ocular involvement to it .
assume center tribute when build a grow fireside to keep off potential middle accidental injury .