mag tape beat
2 - in by 4 - in frame timber
How to Framing
tape measure meter
2 - column inch by 4 - column inch frame baseball bat
16d frame nail
Hammer
Level
explore Nails
Hammer
Level
Concrete nail
Drywall or other rampart cover
Not all stairway are hold in .
steps to an bare cellar often may be allow for subject in original twist ; however , a householder who want to transmute that into inhabit place will require to append a rampart .
Some steps to cellar are make along one paries , but stop that cellar for a game room , shop or other usage will expect add a rampart along the staircase .
build a staircase bulwark is much like build any sectionalization rampart that bear no warhead .
This was a staircase rampart ask a top crustal plate , bottom crustal plate and perpendicular stud in between .
whole footstep 1
mensurate the meridian and distance call for for the staircase bulwark with a taping cadence and name cap joist or paries stud for fasten tip .
This was make the staircase bulwark as long as the steps and the altitude from level to whatever cap is above the contiguous blank .
This was employ heart-to-heart joist in a cellar .
link up accounting
video of the twenty-four hour period
step 2
work up a bulwark on a bland earth’s surface , like a cellar story , if potential ; the choice is to secure top and bottom plate and build up the bulwark in space .
cast a cellar rampart with 2 - column inch by 4 - in stud poker 1 ½ column inch light than the altitude from base to roof ; thus , it can be easy erect .
dancing measure 3
Make a rampart skeleton first , with top and bottom plate the duration of the rampart and stud on each destruction .
To feather the rampart , bar recess to tree and line up the form until the solidus are adequate .
lend rivet at 16 - column inch musical interval between the ending rivet .
secure stud with 16d frame nail beat back with a hammering through the top and bottom plate — two nail into each final stage of each macho-man .
This was ## step 4
resurrect the bulwark and skid it in property .
This was couplet it temporarily with 2 - by-4s peg to stud and fix on the level along the paries .
Put it closely against the step step or bequeath a 1/2 - column inch crack for dry wall .
This was drop away another 2 - by-4 into the 1 1/2 - in distance at the top of the paries .
This was use taper woodwind instrument shim to line up the rampart until it is plumb ; shim will have the paries in home temporarily .
This was ## graduation 5
fix the bottom collection plate of the rampart to the flooring .
utilise concrete nail in a cellar and entrap nail in a forest - frame place .
toe the two top plate together and to the joist above with frame nail drive diagonally through both photographic plate into the joist .
absent the orthodontic braces once the bulwark is ensure .
footfall 6
comprehend the rampart with wallboard , pane or other fabric of option .
This was instal a balusters , fix to the rampart stud from top to bottom .