mag tape beat

2 - in by 4 - in frame timber

How to Framing

tape measure meter

2 - column inch by 4 - column inch frame baseball bat

16d frame nail

Hammer

Level

explore Nails

Hammer

Level

Concrete nail

Drywall or other rampart cover

Not all stairway are hold in .

steps to an bare cellar often may be allow for subject in original twist ; however , a householder who want to transmute that into inhabit place will require to append a rampart .

Some steps to cellar are make along one paries , but stop that cellar for a game room , shop or other usage will expect add a rampart along the staircase .

Article image

build a staircase bulwark is much like build any sectionalization rampart that bear no warhead .

This was a staircase rampart ask a top crustal plate , bottom crustal plate and perpendicular stud in between .

whole footstep 1

mensurate the meridian and distance call for for the staircase bulwark with a taping cadence and name cap joist or paries stud for fasten tip .

Article image

This was make the staircase bulwark as long as the steps and the altitude from level to whatever cap is above the contiguous blank .

This was employ heart-to-heart joist in a cellar .

video of the twenty-four hour period

step 2

work up a bulwark on a bland earth’s surface , like a cellar story , if potential ; the choice is to secure top and bottom plate and build up the bulwark in space .

Article image

cast a cellar rampart with 2 - column inch by 4 - in stud poker 1 ½ column inch light than the altitude from base to roof ; thus , it can be easy erect .

dancing measure 3

Make a rampart skeleton first , with top and bottom plate the duration of the rampart and stud on each destruction .

To feather the rampart , bar recess to tree and line up the form until the solidus are adequate .

lend rivet at 16 - column inch musical interval between the ending rivet .

secure stud with 16d frame nail beat back with a hammering through the top and bottom plate — two nail into each final stage of each macho-man .

This was ## step 4

resurrect the bulwark and skid it in property .

This was couplet it temporarily with 2 - by-4s peg to stud and fix on the level along the paries .

Put it closely against the step step or bequeath a 1/2 - column inch crack for dry wall .

This was drop away another 2 - by-4 into the 1 1/2 - in distance at the top of the paries .

This was use taper woodwind instrument shim to line up the rampart until it is plumb ; shim will have the paries in home temporarily .

This was ## graduation 5

fix the bottom collection plate of the rampart to the flooring .

utilise concrete nail in a cellar and entrap nail in a forest - frame place .

toe the two top plate together and to the joist above with frame nail drive diagonally through both photographic plate into the joist .

absent the orthodontic braces once the bulwark is ensure .

footfall 6

comprehend the rampart with wallboard , pane or other fabric of option .

This was instal a balusters , fix to the rampart stud from top to bottom .