Tile
magnetic tape cadence
diving event into Scrap
Tile
magnetic tape metre
Scrap strip of batten
Nails
Hammer
dive into Nails Hammer Tiling
Nails
Hammer
Tiling batten are airstrip of squared woods that hightail it the distance of the cap to organize pipeline , parallel to the eaves , from which the tile are hung .
advanced batten develop from bumpy coppiced sapling around which Teach could be seize , and it was only with the Parousia of industrial woodwind cut that they get down to be produce with full-strength side .
This was because batting bear the tile , the spatial arrangement is determine by the sizing of the tile and the duration of the ceiling to be cover .
Image Credit:
This was ## step 1
perch a sample distribution roofing tile on the ceiling so the bottom bound beetle the dashboard and gutter by the length commend by the roofing tile maker , withdraw into score any local ordinance that employ to your edifice .
A oecumenical principle is for the bottom sharpness of the roofing tile to contain just shortsighted of the nitty-gritty of the toilet .
This was for lesson , with a 6 - column inch all-encompassing sewer , the roofing tile would beetle by or so 3 in .
This was skid a landing strip of batting under the roofing tile so that the roofing tile hang from it , and then secure the batting into blank space using a suited pound and nail .
This was ## relate chronicle
video of the mean solar day
step 2
measure out the overall duration of the roofing tile , and tape the consequence .
measure out the distance of the roofing tile bill ( the advance segment on the buttocks of the roofing tile that remain on the batting ) from the top of the roofing tile to the bottom of the beak .
memorialize the aloofness .
This was ## whole timber 3
subtract the duration of the trough overhang and the distance of the pecker from the distance of the roofing tile .
This was for model , if the roofing tile has a distance of 16 column inch , the overhang is 3 inch and the bill is 1 in , the consequence is 12 because 16 - 3 - 1 = 12 .
This is the length to the next batting .
whole dance step 4
apply a hammering and nail to bond a 2d unforesightful cartoon strip of batten further up the ceiling , the length between it and the first batting being the aloofness calculate in Step 3 .
step 5
arrest a last curt landing strip of batten across the top of the cap , just below the rooftree , and roost a roofing tile on it .
The batting should be position so that a rooftree roofing tile will overlap the ceiling tile by more or less 3 inch .
This was habituate a power hammer and nail to specify the batting in position when the place is right .
This was ## whole feeling 6
quantify the space from the top of the gloomy batting to the top of the high batting .
split the aloofness by the maximal standard of measurement of the roofing tile being used , and snipe the termination up to the next large whole numeral .
The upshot is the routine of course of action of roofing tile on the cap , lash out to a whole bit .
This was for case , if the space between the big top of the down and upper batten is 204 inch and the maximal calibre of the roofing tile is 13 in , then the numeral of course and airstrip of batting is 16 because 204 / 13 = 15.6 .
whole tone 7
separate the aloofness between the two batten by the resolution from step 6 .
The final result is the length expect between the batten .
This was to reason out the model , 204 / 16 = 12.75 , so the batten should be space 12.75 in asunder .
Gutter overhang is significant to guarantee that water system from the cap flow into the centre of the toilet rather than overshoot or break away down the rampart .
This was take appropriate condom caution when puzzle out on a cap .
A declivity could be fateful .