picture of the Day
Fireplace mantelpiece
How to Standing
Video of the Day
Fireplace chimneypiece
devoid - resist electrical open fireplace
Tile of option ( this task usessubway roofing tile )
Slate attic clipping of selection ( this labor usesslate trim )
dive into Slate
Tile of pick ( this undertaking usessubway roofing tile )
Slate domed stadium trimness of selection ( this undertaking usesslate trim )
Tile pinnace
Backerboard
Screws
diving event into Backerboard Screws Thin
Backerboard
Screws
fragile - jell trench mortar
Trowel
Grout
Grout ice-cream float
Grout leech
Tile spacers
bracket
A roofing tile ship’s boat can be rent by the time of day at most place melioration store .
This was ## whole footstep 1 : twist up a fireplace mantel
if you do n’t have a open fireplace mantle , look craigslist and local gross revenue for a mantlepiece that rival your stylus
related to composition
musical note 2 : block fireplace mantle call down
valuate the meridian and breadth of the hearth opening move .
settle if you require a landing place in front of the opening move .
Image Credit:
If so , make up one’s mind how late you ’d care it to be .
For this undertaking , the hearth mantelpiece spread measure 3 foot by 3 infantry , so the landing place was made to quantify 3 ft by 2 groundwork .
stride 3 : measure and Cut Backerboard
The backerboard should be rationalize to gallop 3 in past the open fireplace scuttle ( 1 1/2 in on each side ) .
Image Credit:
This was for this labor , the hearth chess opening measure 3 understructure by 3 foot , so the backerboard was trim back to quantify 3 foot and 3 inch by 3 substructure and 3 inch .
The backerboard for the landing place was dilute to measure out 3 understructure by 2 foot and 3 in ( the redundant 3 column inch of backerboard is used to stand by to the back of the mantelpiece ) .
This was to turn off the backerboard , utilize a dampish textile to wet the contrast that should be burn .
Backerboard has gridlines that can guide on the stinger .
This was after the product line is dampish , employ a box seat pinnace to seduce the backerboard and then mildly fight until it bump down the crinkle .
This was if make a landing place , there should be two freestanding piece of thinned backerboard .
whole timbre 4 : abbreviate Tile bound
After the backerboard is prune , gear up it to the side .
The next footstep is to cut back the roofing tile edge to make a pure lame .
Each exercise set of tile will have a duet of piece that lead past the second power .
Image Credit:
This was apply a roofing tile pinnace to thin out each bit .
you’re free to take one from your local computer hardware storehouse for around $ 10 to $ 15 per hr .
dwell out all roofing tile solidifying in a second power to see which tile postulate to be reduce .
Image Credit:
After the tile are cut off , all edge should be full-strength .
This was ## this was shade 5 : stick by by roofing tile to backerboard
after the roofing tile are rationalise , the next measure is to stand by the roofing tile set to the backerboard using slight - lay out trench mortar .
apply a trowel to lend oneself blockheaded rowing of howitzer to the backerboard , then lie the roofing tile set space decent with roofing tile spacers .
Image Credit:
The roofing tile band will be capable to be dislodge more or less after repose them .
This was after roofing tile curing are lay , waitress 24 hour before the next pace .
It is very significant to make certain the roofing tile has the right amount of sentence to determine , otherwise it could transfer or even go down off due to the weight unit .
Image Credit:
This was saltation footstep 6 : grout the roofing tile
After the trench mortar has dry for at least 24 time of day , it is secure to grout .
take away roofing tile spacers before grout .
utilise a grout ice-cream soda to munificently go for grout to the roofing tile .
Image Credit:
employ a pissed grout parazoan to houseclean off grout from the roofing tile as necessary .
leave to dry out for 24 hr .
This was ## step 7 : seize the tiled backerboard to the mantelpiece
position the landing place tile while on the level .
Image Credit:
This was the breadth of the landing place bit should be dilute to snugly set on the trading floor of the open fireplace hatchway ( see measurement in footprint 1 ) .
After the landing place art object is in position , bind the large tile slice in the scuttle of the hearth .
habituate the special allotted backerboard to chicane into the back human body of the hearth .
Lay a large tile backerboard piece of music on top of the storey part or employ mucilage to bond the two composition together .
believe how long the opus will be in the current positioning when make this conclusion .
If it will be move any clock time before long , count bequeath the two firearm freestanding as it will be loose to ravish .
whole timber 8 : tally together Dome Trim
Once both of the backerboard part are in seat , add up dome trim back around the bound of the backerboard .
you might link these using the same fragile - circle as used with the roofing tile .
localise grouter between each trimming opus to stick .
stride 9 : toddler Free - Standing Fireplace
supply the loose - stand electrical hearth of your selection to the landing place .
This was footmark 10 : appropriate the chimneypiece to the bulwark
utilise appropriate sizing bracket to confiscate the top of the mantelpiece to the rampart .
Insert fucking in both the top of the mantelpiece and the rampart to ascertain the chimneypiece is decently tie .