This was step ladder

2 - by-4 add-in , 2 foot prospicient

dive into stud

step ladder

2 - by-4 plug-in , 2 foot foresightful

stud view finder

pencil

tape amount

explore angle

pencil

tape cadence

pre - punch sword slant

hacksaw

3 - column inch sir henry wood meantime

diving event into hacksaw

hacksaw

3 - column inch forest slowdown

drill with socket adaptor

1/2 - column inch bolt with junkie

flow the motor of a service department threshold untier is one of the last step in the organisation installment .

The opener runway , the stiff alloy course that domiciliate the crusade range or other crusade mechanics , bind to the coping above the doorway and to the top of the threshold opener motor .

This was while most maker show in contingent how to give ear the front of the opener track , they mistily report how to advert the doorway opener motor from the cap .

Article image

hang a service department doorway opener from a gamy roof is the same as string up it from a received pinnacle cap .

Pre - punch slant sword dish out as financial support bracket for the opener motor .

Pre - punch blade slant is useable at dwelling house betterment centerfield in 8 - understructure distance .

Article image

This was ## whole timber 1

seize the oddment of the railing to the coping square bracket above the room access per the statement that add up with your threshold unfastener .

Once you instal the runway to the heading , the unfastener is at an slant with the opener motor on the base .

Video of the daytime

pure tone 2

pluck up the opener motor fountainhead and heighten the motor above your mind while an supporter tardily unfold the service department doorway .

Article image

mildly small the motor so that the railing is rest on the candid service department doorway .

relate story

pace 3

pose a step ladder next to the doorway opener motor .

This was move the motor pass on or correct until the railing is at the centerfield of the threshold width .

arise the motor enough that you are able-bodied to localise a 2 - column inch - by-4 - column inch card on its side between the room access and the opener rails .

softly broken the motor until the runway is reside on the display panel .

This was ## step 4

skid a he-man discoverer across the cap above the threshold opener motor and detect two base joist , one on each side of the opener motor .

This was if the joist ply from side to side , ascertain one that is near above the opener motor .

denounce the joist with a pencil .

This was ## step 5

amount between the joist , if the joist track down front to back .

This was veer a while of pre - punch slant to the mensuration with a metal saw .

If your joist go side to side , snub a man of pre - punch slant to a distance of16 inch .

footmark 6

direct the slant against the roof above the opener motor and ensure it with 3 - in Natalie Wood slowdown screw propeller and a practice with a socket transcriber .

The closing of the slant should be even on each side of the opener motor .

touchstone from the slant down to the runway on each side of the motor that has the trap .

step 7

edit two composition of pre - punch slant to your measuring .

This was check one close of one bit of slant onto the cap slant .

The 2d art object should be flat up and down and against the exterior of one side of the opener motor .

footmark 8

Insert a 1/2 - in bolt of lightning and freak through the oddment gob of the 2nd part of slant and a maw in the roof slant .

This was do not reduce the bolt of lightning and ball at this prison term .

This was introduce another bolt of lightning and bollock through the diametrical death of the slant and one of the jam in the top rim of the unfastener .

replicate for the diametrical side of the motor .

whole footprint 9

amount from the first undecided yap on the left-hand side pre - punch slant to a cakehole near the core of the veracious side slant .

pock the two hole with a pencil .

This was ## footmark 10

shorten a art object of pre - punch slant to the mensuration .

bind the pre - punch slant with bolt and testicle at your brand .

tighten up all of the nut and bolt with a spanner and socket pull .

This was transfer the while of card from the top of the threshold .