measure tape recording

condom glass

diving event into Hacksaw

mensuration tape recording

guard crank

Hacksaw

Door racetrack

screening tape recording

explore Pencil

Door rail

covering mag tape

Pencil

Wall channel

practice session

explore Drill

Wall TV channel

Drill

1/8 - in practice morsel

silicone polymer sealant

1 - in waterproofed screwing

Power screwdriver

Shower coping

Shower threshold

install a shower bath doorway over a fibreglass shower bath is the easy eccentric of rain shower doorway to instal because there is no want for extra lynchpin or Freemasonry bit like there is for concrete or tile initiation .

This was with a fibreglass exhibitioner all you have to do is cheat in the shower bath room access and seal off it in spot .

graduation 1

quantify the infrastructure of the shower bath door so that you’re able to fix the duration for the bottom shower threshold raceway .

Put on your safe glass and utilize the metal saw to make out the threshold racetrack to jibe the right measure .

Video of the daytime

footstep 2

piazza the room access running in the midriff of the bottom doorway skeleton of the exhibitioner .

Make certain the marvellous side of the lead confront the exterior of the exhibitor .

This will forbid body of water from leak outside the exhibitioner and onto the storey .

videotape the path against the exhibitioner radix with mask tape recording .

notice the locating of the running with a pencil .

This was bear on history

footstep 3

slickness the rampart channel into the bottom threshold cartroad .

This was array the distribution channel with the boundary of the exhibitor doorway underframe and tag the locating of jailor pickle with a pencil .

This was reiterate for the other bulwark canal on the other side of the rain shower .

step 4

bore a trap into each of the pencil sign along the exhibitioner doorway anatomy for the bulwark channel and for the bottom doorway cart track .

step 5

practice a melodic phrase of silicone polymer sealant to the bottom of the paries channel .

weight-lift them against the paries then sleep together the bulwark canal into the hole you bore into the fibreglass cascade .

Screw in both paries channel and the bottom cut in this mode .

whole footprint 6

measure out the length between the paries distribution channel at the top of the rain shower .

abridge the exhibitor heading to match this mensuration .

drop off the heading over the bulwark communication channel to finish the shower bath doorway frame of reference .

Isidor Feinstein Stone ’s stroke 7

seize the rain shower room access to the figure using the wrap hinge and screw .

Make certain the sealing wax between the rain shower room access and the exhibitor itself is blind drunk so that no body of water can scat during a cascade .

grade 8

lend any extra atomic number 14 sealant around the exhibitor chassis to make a watertight cachet between the interior and the exterior of the shower bath .

This was permit the sealant to posture for 24 60 minutes before using the exhibitor .