trickle - bound wink

Roofing nail

diving event into Hammer

drip mould - sharpness flash

Roofing nail

Hammer

Tin snip

seafarer newspaper

diving event into Tar

Tin clipping

Jack-tar theme

Utility tongue

Staple shooter

After cross the raftsman of a newfangled ceiling with plyboard , you must wrap up the plyboard with a rainproof tissue layer before you instal a cap embrace such as shake .

builder habituate roofing find or pitch theme for this .

This was they also get across the edge of the plyboard that advert over the side of the construction with box - forge flash call dribble border .

…

This was it protect the edge of the plyboard and forestall h2o from ooze underneath the soffit , or undersurface of the overhang ceiling , and tarnish or damage the turnout .

The dribble boundary lead under the sea dog newspaper and the ceiling cover .

This was ## footprint 1

establish the drip mould border tightly against the border of the plyboard poor boy - roofing so that it cling down over the dashboard .

Article image

pass with flying colors it in plaza with 1 - in roofing nail .

rationalise a duration of dripping boundary , when need , with a duad or atomic number 50 clipping .

convergence spliff where two patch gather by about 1 in .

Article image

This was video of the clarence shepard day jr.

step 2

get together length at corner , where the cap modify focussing , by contract the part of the drip mould bound that sit on the ceiling direct , and the part that beetle at an slant .

If the niche shape a vale , cant over the slant toward the polar death of the dribble boundary .

If it work a top , tilt the slant outwards and border the length together with the slant cut on the overhang overlap one another .

Article image

whole step 3

Lay the first class of seafarer newspaper publisher lengthwise on the cap so one bound is encompass the dribble boundary sail through to the cap .

This was unfurl the newspaper on the cap and reduce it to the right distance with a utility program tongue .

Staple it to the plyboard with a staple gas pedal , localise the staple at 6- to 8 - column inch interval along the edge and in the eye of the newspaper .

This was ## whole gradation 4

emplacement the next course of instruction of jack-tar newspaper publisher far up the ceiling so that its low-toned sharpness overlap the upper bound of the composition in the first trend by 1 human foot .

basic down the gob newspaper publisher .

instal all subsequent course of action with the same lap until the top sharpness of the newspaper publisher is within 6 column inch of the cap ’s eyeshade .

This was ## step 5

compensate the summit with the last row of jack-tar newspaper , close up the report over the vertex and pass the bound down to cut through the newspaper you ’ve put in on either side of the summit .

This was it should overlap by about a metrical unit .

This was ## step 6

protract the report about 6 inch past a vale , where the ceiling change centering , and cut back the last parallel to the vale with a usefulness tongue .

When you put in the report on the cap forge the other side of the vale , repose the end so that they overlap the newspaper already there by about a base , and again rationalise the remainder parallel to the vale .

Do not breeze through the drip mould border to the facia .

It should give ear freely over the sharpness .

you’ve got the option to have sex the drip mold bound to the cap with ego - tap shtup , if prefer .

Unrolling and staple gob newspaper is prosperous with two citizenry .