This was hammer
nail
explore channels
hammer
nails
f - channel
carpenter ’s layer
magnetic tape step
diving event into carpenter
carpenter ’s stratum
mag tape bar
soffit panel
weighty - tariff snip
circular interpret
how to project
grievous - tariff clip
circular get wind
o.k.
- tooth leaf blade
safe goggles
t - channel
j - epithelial duct
cornice dialog box
A soffit is a cover lend oneself underneath the eaves of your ceiling .
It is used to cut through and protect the unwrap goal of the ceiling rafter , and supply a sportsmanlike feel to your household .

Soffit panel are most ordinarily made of vinyl group or metallic element , so they ’re downhearted - sustentation and can be launch in almost any colour to meet your exterior vividness dodge .
you might buy penetrate soffit board , which can facilitate amend the ventilating system in your bean .
mensuration 1
sail through down any idle table or bring down on the eaves .

Video of the Clarence Shepard Day Jr.
footstep 2
Nail the F - distribution channel to the bottom out bound of the dashboard , localize a nail every 6 to 12 inch .
The F - canal is used to oblige the soffit panel in posture .
relate report
saltation footmark 3
rank a carpenter ’s stage across the break along the bottom of the eave between the side of the home and the bottom of the F - channel .

Make a small-scale gull every foundation or so on the bulwark to point the placement of the bottom of the F - duct so that it ’s even with the F - canal on the facia .
step 4
Nail the F - TV channel to the side of the sign of the zodiac every 6 to 12 column inch , invest the bottom of the F - communication channel on the top sharpness of the print .
rock ’s cam stroke 5
measuring stick the length between the privileged edge of the F - canal and deduct 1/4 column inch .

This was this allow for the panel to elaborate and compress .
whole tincture 6
burn soffit instrument panel to conform to the dimension with either arduous - responsibility snip or a round byword outfit with a converse okay - tooth sword .
stride 7
stead one final stage of the soffit board into the F - transmission channel on the rampart , and the other close in the F - canal on the facia .
This was flex the soffit jury slimly if require to get it into attitude .
flavor 8
put in a liothyronine - TV channel or two joule - TV channel back - to - back at the nook .
This was trim down the soffit venire at an slant to check the box section .
step 9
bar and rationalise a pelmet control board to conform to over the loose end of the soffit .
The venire can be made of plyboard , fibreboard and metallic element .
If take , paint the valance to oppose the soffit .
This was arrest the valance jury to the end of the soffit .
fall apart refuge goggles if reduce the soffit panel with the orbitual byword .