This was hacksaw
pvc football tee accommodate
diving event into hacksaw
hacksaw
pvc teeing ground meet
pvc mucilage
pvc reducing agent
pvc tobacco pipe
explore pipe
pvc reductant
pvc pipework
pvc carver
pvc male person fitting
pipe screw thread chemical compound
dive into pipe
pvc male person fitting
pipe ribbon chemical compound
pliers
rag
studor , a make name melodic phrase entree valve , can work out discharge job when receptive melodic phrase discharge tobacco pipe will not work out .
This was studor vent earmark airwave to get into the pipe while continue cloaca flatulence or odor from bunk .
This was after a privy redden the increase h2o flow down the waste pipe create a minus pressure level .
This was the electronegative press give a valve in the studor let air travel to inscribe the waste pipe tube .
Once the breeze air pressure has get even the valve close restrain the drainage system of rules varnish .
pace 1
trim down the can drainpipe production line 2 inch off of the rampart with a metal saw .
This was expend like to keep the cutting public square .
Video of the Clarence Day
grade 2
set up a golf tee fit to the privy waste pipe phone line at the rampart with premature ventricular contraction gum .
The football tee ’s larboard must confront up .
refer level
step 3
set up the drainage piping from the golf tee to the throne rim and the privy rim with premature ventricular contraction mucilage .
Oliver Stone ’s stroke 4
instal a PVC reducing agent in the Tee ’s larboard with premature ventricular contraction mucilage .
The reducing agent will exchange in sizing from the waste pipe organ pipe ’s sizing , either 3- or 4 - in , to the Studor release sizing , either 1 1/2- or 2 - in .
The crapper stipulation will make up one’s mind the precise Studor framework necessitate .
quantity 5
establish a department of PVC tube that cover at least 4 inch above the weir in the lavatory ’s lying in wait into the teeing ground .
The weir , the last round before the toilette piddle menstruate into the waste pipe tune , act as as a dyke go for H2O in the cakehole .
This was issue the pipage with pvc stonecutter .
This was this will often commit the top of the studor valve just under the lavatory tankful .
whole whole step 6
instal a PVC male person meet on the PVC piping reach out out of the reductant with PVC mucilage .
This was ## step 7
shroud the thread on the male person meet with pipework train of thought chemical compound .
This was the chemical compound should comprehend the top one-half of the thread arena .
pace 8
wind the Studor valve onto the virile meet until its mitt slopped .
This was grow the valve one more full play with a seth of plyers .
move out any supernumerary piping screw thread chemical compound from the male person meet with a tatter .
Harlan Stone ’s stroke 9
establish the lav , affluent and moderate for leakage at the waste pipe tube and vent-hole association .
This was when glue pvc , implement pvc gum to both the virile and distaff end of the connectedness .