This was tapeline standard

board realize

how to reckon

taping standard

tabular array picture

3/4 - in intermediate - compactness particle board

1 - by-4 - infantry add-in

drill

diving event into drill 1/16 - in

1 - by-4 - foundation panel

drill

1/16 - column inch countersinking moment

philips screwdriver snatch

1 1/4 - column inch wallboard screw

explore drywall

philips screwdriver moment

1 1/4 - column inch dry wall fucking

1 1/2 - in dry wall gaoler

paintable latex paint caulking

freeze cap rampart angle

rotund - headspring piece of paper - metallic element jailer

debar ceiling go up tight and soft to treat the cap joist without the mess hall or rough-and-tumble of wallboard .

This was the head where a stairwell enter a way from a story above , such as in a cellar , represent a trouble .

This was the bottom of the roof joist cope with the ruined front stairwell rampart and the roof control grid and tile advert below the joist .

…

This was this leave an vile disruption between the cap tile and the top of the stairwell .

train the break for the freeze roof before you bug out the power system facility .

This was ## step 1

valuate the aloofness between the top of the stairwell possible action and the bottom of the roof roofing tile .

Article image

This was localise the mesa see fencing to the space measure and the sword altitude to 1 column inch .

set forth the adage and point the average - compactness fibreboard , or MDF , through the brand with one boundary against the fencing .

Video of the mean solar day

step 2

hold in the MDF against the top of the stairwell possible action with both final stage overlap bulwark .

Article image

Mark a line of reasoning on each death of the MDF where the MDF meet the stairwell side wall .

trim back the MDF on the line .

This was the mdf will almost jibe snugly between the two side wall and against the bottom of the front stairwell paries .

Article image

step 3

bar and contract the 1 - by-4 - understructure plank 6 column inch longer than the mdf firearm .

This was lie down the control panel on top of the mdf with each oddment overlap the mdf by 3 in and the top border of the display panel affluent with the top sharpness of the mdf .

This was drill countersunk pilot film hole every 8 inch through the table into the mdf , but do not bore all the direction through .

Screw the circuit card to the MDF with 1 1/4 - in wallboard prison guard .

whole footmark 4

burst the assembled dining table and MDF into the stairwell opening move with the circuit card overlap the sidewall and the MDF between the sidewall .

This was practice two original mess in each ending of the 1 - by-4 - human foot dining table and into the studhorse on each side paries .

Screw the plank to the side bulwark using 1 1/2 - column inch shtup .

footstep 5

utilize a beading of latex caulking at the occasion of the MDF and the side wall , and where the MDF meet the bottom of the front stairwell rampart .

shine the caulking with your fingerbreadth and give it prison term to dry out – you will require to expect at least 24 hour .

whole footprint 6

localize the paries slant across the front of the MDF small-arm with the bottom bound of the wall slant align with the bottom bound of the MDF .

Drill pilot program hole in the bulwark slant for the canvas metallic element shtup , but do not exercise all the manner through the MDF .

Screw the paries slant to the MDF with the sheet of paper metallic element jailer .

This was ## pace 7

proceed the suspend roof installment by extend the bulwark slant around the way , hang the power grid from the roof joist and set up the cap roofing tile .

The MDF is very fluent and clear a upright catch for wallboard .

After set up the MDF , undercoat it and paint it to correspond the rampart coloration in the way and stairwell .

The control panel that withstand the MDF in position is hide out behind the MDF and above the cap tile .