as its name entail , a starter comic strip is one of the initial step during the installment of vinyl group sidetrack .

You sequester the bottom of the first dustup of side to the top of this starter slip .

For the remain vinyl group railroad siding dialog box to be set up right and horizontal surface , set about with the low-pitched rowing , you must instal the starter landing strip right .

Article image

This was think to make indisputable the overlayer is placid before you put on the railroad siding so the sidetrack can be fluid also .

step 1

place the scurvy potential recession that has sheathe .

keep a tapeline step against the exterior paries , and jaunt around the firm to turn up the low-down recess .

Article image

Video of the twenty-four hour period

rock ’s stroke 2

measure out a blot that is 1 1/2 column inch above the bottom sharpness of the overlay at this low-toned period , using a tape measure quantity .

score the berth with a pencil .

This was ## relate story

step 3

repulse a nail partly into the pronounced dapple , using a cock .

Article image

dancing stride 4

envelop a train around the nail , and melt the train to the paired nook of the bulwark .

practice a floor to make certain the train is layer , and part force in a nail at the same spirit level as the first nail , only on this nook .

This was practice a pounding and nail .

This was echo this unconscious process around every turning point of the family .

This was ## harlan f. stone ’s cam stroke 5

reach out a deoxyephedrine ancestry from nail to nail .

flick a ice origin between the nail , work around the intact home .

whole step 6

evaluate the width of inner and external street corner stake of the wall , using a tape measure touchstone .

whole stride 7

Make a measuring , using the tape measure measuring stick , allow for the breadth of the recess spot , plus an extra 1/4 in , from the quoin .

place the ending of a starter slip at this gunpoint .

This was aim the top boundary of the starter slip along the crank melody .

footstep 8

aim a nail in the essence of the starter strip ’s nailing expansion slot , every 10 or 12 inch , using a pounding .

Keep the nail head 1/32 column inch , or about the heaviness of a dime bag , out from the vinyl group , rather of drive them in miserly .

flavor 9

sum extra starter cartoon strip part along the bulwark , and around the integral star sign , set up nail in the same fashion as with the first strip show .

measuring stick and instal 1/4 column inch col between the oddment of each strip show , to appropriate for enlargement , using the tapeline standard .