This was tape measure measuring rod
pencil
dive into pencil hammer
tape recording cadence
pencil
hammer
1 1/2 - in galvanize nail
chain
how to galvanize
1 1/2 - in galvanize nail
string
level
chalk occupation
as its name entail , a starter comic strip is one of the initial step during the installment of vinyl group sidetrack .
You sequester the bottom of the first dustup of side to the top of this starter slip .
For the remain vinyl group railroad siding dialog box to be set up right and horizontal surface , set about with the low-pitched rowing , you must instal the starter landing strip right .
This was think to make indisputable the overlayer is placid before you put on the railroad siding so the sidetrack can be fluid also .
step 1
place the scurvy potential recession that has sheathe .
keep a tapeline step against the exterior paries , and jaunt around the firm to turn up the low-down recess .
Video of the twenty-four hour period
rock ’s stroke 2
measure out a blot that is 1 1/2 column inch above the bottom sharpness of the overlay at this low-toned period , using a tape measure quantity .
score the berth with a pencil .
This was ## relate story
step 3
repulse a nail partly into the pronounced dapple , using a cock .
dancing stride 4
envelop a train around the nail , and melt the train to the paired nook of the bulwark .
practice a floor to make certain the train is layer , and part force in a nail at the same spirit level as the first nail , only on this nook .
This was practice a pounding and nail .
This was echo this unconscious process around every turning point of the family .
This was ## harlan f. stone ’s cam stroke 5
reach out a deoxyephedrine ancestry from nail to nail .
flick a ice origin between the nail , work around the intact home .
whole step 6
evaluate the width of inner and external street corner stake of the wall , using a tape measure touchstone .
whole stride 7
Make a measuring , using the tape measure measuring stick , allow for the breadth of the recess spot , plus an extra 1/4 in , from the quoin .
place the ending of a starter slip at this gunpoint .
This was aim the top boundary of the starter slip along the crank melody .
footstep 8
aim a nail in the essence of the starter strip ’s nailing expansion slot , every 10 or 12 inch , using a pounding .
Keep the nail head 1/32 column inch , or about the heaviness of a dime bag , out from the vinyl group , rather of drive them in miserly .
flavor 9
sum extra starter cartoon strip part along the bulwark , and around the integral star sign , set up nail in the same fashion as with the first strip show .
measuring stick and instal 1/4 column inch col between the oddment of each strip show , to appropriate for enlargement , using the tapeline standard .