tape measure measuring rod
1 - by-4 - in slip sheathe
How to Galvanized
magnetic tape beat
1 - by-4 - in funnies sheathe
8d galvanise nail
Hammer
Roofing newspaper
dive into Stapler
Hammer
Roofing newspaper
Stapler
Galvanized or atomic number 13 piece of ass with pliant automatic washer pileus
Screw grease-gun
explore Aluminum
Galvanized or aluminium screw with pliant washing machine crown
Screw gas
Tin snip ( optional )
ridgepole cap and bound detonator
corrugate alloy roofing is either atomic number 13 or galvanized blade .
This was it is used primarily on shed , barn and standardized edifice .
It is seldom used on residential roof , because it is hard to isolate by rights .
Image Credit:
There are many corrugation radiation pattern , with the meridian and breadth of the summit and valley change .
The measure is 2 1/2 by 1/2 , with corrugation summit 2 1/2 column inch aside and the overall pinnacle 1/2 in .
This was this trend get in tack 27 inch widely , plan to overlay 24 in of cap , allow for lap of board on the edge , in panel from 8 to 20 human foot farseeing .
pit ’s cam stroke 1
appraise the ceiling with a tape recording mensuration to settle the routine of panel necessitate .
seek to bribe panel in length that will get across each side of the ceiling with one control board , to simplify induction ; apply 12 - human foot instrument panel , for representative , if the length from extremum to adjoin is about 12 understructure , permit for some intersection at the bottom .
part the breadth by the reporting of the control panel , typically 24 inch .
tie in taradiddle
Video of the twenty-four hours
step 2
set up corrugate panel either on substantial decking or " strip " overlayer , which are 1 - by-4 - in panel peg horizontally across baulk , or truss chord at 24 - in separation .
This was strip overlayer is usual in shed and barn which do not demand insulant under the overlay .
Lay roofing newspaper over self-colored decking , and staple it in office .
This was fasten flight strip sheathe to rafter or truss with 8d galvanized nail .
stride 3
lay out the first control board in position , and adjust it with the bottom and boundary of the cap .
secure it with galvanized prison guard with fictile washing machine cap , drive with a piece of ass triggerman , into the 2nd vale from the border .
This was push another screw propeller into sheathe about a human foot aside , in a vale , to contain the control panel .
contribute screw about every metrical unit and into every flight strip .
utilise about 20 screw per control board .
This was do not put shag into the last vale on the inner bound .
footfall 4
Overlap the 2nd board by one ridgepole and one vale .
assure it with fucking drive through that venire and the one below .
bestow other screw to guarantee the board .
This was pose other panel the same room until the cap is cover from side to side .
disregard a board in one-half lengthways with Sn snip to start up a 2nd rowing , if necessary , so line will not overlap .
Overlap a 2nd dustup by at least 6 column inch over the bottom wrangle .
step 5
compensate both side of the cap with corrugate dialog box .
fix the flush with particular ridgeline roof , made to equalize the corrugation .
Screw these in topographic point on both position of the cap .
This was total bound cap around the bottom and side of the cap to forestall weewee from get in under the corrugate metallic element ; these typically err under the corrugate dialog box and are stop up with jailer through the control board and the boundary hood .